Structural engineer reviewing load bearing wall removal plans for an Alberta home

The Legal Answer First

Why the Requirement Exists

What a Structural Engineer Actually Does in This Process

What Happens If You Skip the Engineer

“But My Contractor Said It’s Fine”

Contractor installing a support beam during a load bearing wall renovation in Calgary

Ready to Move Forward? Let’s Make It Simple


✉️ info@tamcrete-eng.com

Frequently Asked Questions

Is it illegal to remove a load bearing wall without a permit in Alberta?

Yes. Removing or altering a load bearing wall without a building permit which requires stamped structural drawings is a violation of Alberta’s building code and can result in a stop-work order or complications during a home sale.

Can a contractor size the beam instead of an engineer?

No. Only a licensed Professional Engineer (P.Eng) can perform the structural calculations and provide the stamped drawings required for a City of Calgary building permit.

How long does the engineering process take?

Timelines vary by project scope, but a typical load bearing wall assessment and stamped drawing package can often be completed within a few business days to a couple of weeks. Contact Tam-Crete Engineering for a project-specific estimate.

What if the wall was already removed without a permit?

It’s still possible and strongly recommended to bring in a structural engineer after the fact to assess the work and, if needed, obtain retroactive permit approval.

Does this apply to small walls too, not just major structural openings?

Yes. Permit requirements apply to load bearing wall removal regardless of the wall’s size, since even a small load bearing wall is part of the building’s structural load path.