Structural cross-section of a Calgary home showing basement secondary suite framing and foundation

What Is a Secondary Suite in Calgary?

Secondary suites can take several forms:

Why a Structural Engineer Is Often Required Not Optional

So when exactly does engineering become necessary?

6 Situations Where You Need a Structural Engineer for Your Secondary Suite or Home Addition

1- Removing or Modifying a Load-Bearing Wall

2- Basement Underpinning

3- Creating a New Exterior Entrance

4- Second Storey Home Additions

5- Rear or Side Additions Connected to Existing Structure

6- Any Addition That Affects the Structural System

What Do Stamped Structural Drawings Actually Include?

Calgary’s Secondary Suite Incentive Program: What You Need to Know

This means the sequence matters:

The Real Cost of Skipping Engineering

How Tam-Crete Engineering Supports Your Calgary Secondary Suite or Home Addition

Step 1 — Initial Consultation

Step 2 — Site Assessment

Step 3 — Structural Design & Stamped Drawings

Step 4 — Permit Support

Step 5 — Construction Review (if required)

Completed legal secondary suite basement in a Calgary home with proper egress windows and finished interior

Ready to Move Forward? Let’s Make It Simple.


Frequently Asked Questions

Do I always need a structural engineer for a secondary suite in Calgary?

Not always — but in most cases involving basement development, you will. If your project requires removing or modifying any wall, cutting through the foundation for a new entrance, lowering the basement floor (underpinning), or adding a beam, a structural engineer’s stamped drawings are required by the City of Calgary before your building permit can be issued.

What is the difference between a development permit and a building permit for a secondary suite?

A Development Permit confirms your project complies with the City of Calgary’s Land Use Bylaw — zoning, setbacks, and suite allowances for your specific property. A Building Permit covers the construction itself and ensures it meets the Alberta Building Code. Secondary suites in Calgary typically require both. Structural engineering documentation is submitted as part of the Building Permit application.

Can my contractor prepare the structural drawings instead of an engineer?

No. Only a professional engineer (P.Eng) registered with APEGA the Association of Professional Engineers and Geoscientists of Alberta can legally stamp and sign structural drawings in Alberta. A contractor can prepare architectural floor plans, but any drawings covering structural elements must carry an engineer’s stamp for the City of Calgary to accept them.

How long does it take to get structural drawings for a secondary suite or home addition?

At Tam-Crete Engineering, most residential projects are completed within one to three weeks from site assessment to final stamped drawings, depending on project complexity. We recommend engaging our team before finalizing your contractor timeline so permit submission isn’t delayed.

Does adding a secondary suite increase my property taxes in Calgary?

Potentially, yes. Adding livable square footage to your home may increase its assessed value, which is the basis for property tax calculation. For specific questions about property tax impact, the City of Calgary recommends contacting 311 directly. What’s certain is that an unpermitted suite carries far greater financial risk including forced removal costs than a properly permitted one.

Leave a Reply


Math Captcha
6 + 1 =